In the last few days meetings have been held concerning specific aspects of the Masjid.
Meeting Details:

  • Shabana Bahen Hakim (Interior Designer) presented tiles and designs for the kitchen and bathrooms. A color palette and tiles were finalized.
  • AV Related meeting was held – Murtaza Bhai Dabbawala explained AV System and specific placements of Interior and Exterior Speakers, Screens and Door Access Panels.
  • At the Masjid – Arched Window Framing is in process and Sheetrock (walls) continue to be put up.
  • Currently Murtaza Bhai Tinwala is in India and has met with the “Asmaullah” manufacturer to see the designs as well as the gold waraq (gold leaf) and Khalash (Finial).