Masjid Updates:
- The contractor is collecting subs and Engineers’ letters and reports in preparation for the Building Final.
- A company has been shortlisted to do the Marble Installation in the Qibla. It has been a challenge to find the right people. / craftsmen for the intricate scope of work.
- Elevator phone was installed – a key piece in getting the elevator work done.
- Monday – the electrician, fire, elevator and alarm techs will be onsite.
- Missing inlet grill in the electrical room – this will be taken care of this week. The inlet would work to suck air out of the electrical room.